From 2,400 dpi plate rooms to ISO Class 1 cleanrooms and 95% COD-removal wastewater systems — MCLANTIS engineers, integrates, and commissions production-critical facilities across seven sectors. Every system calibrated. Every handover documented.
Each sector operates as a dedicated engineering practice with its own specialists, standards, and delivery protocols.
CTP/CTCP integration, automated plate processing, punch-bend lines, RIP and color management.
Offset and web press installation, ink kitchens, bindery lines, press hall layout and utilities.
DAM systems, XML workflows, e-book conversion, multi-channel output, editorial CMS, DRM.
University press, thesis output, journal printing, archival digitization, repositories.
Cleanroom design (ISO Class 1-8), equipment hook-up, ultrapure water, chemical delivery, FMCS.
Inner-layer imaging, drilling, electroplating, solder mask, surface finish, routing, and electrical test lines.
Printing and electronics effluent, chemical precipitation, membrane filtration, water reuse.
| Sector | Precision / Class | Key Capability | Timeline | SLA | Certification |
|---|---|---|---|---|---|
| Prepress & Plate Room | ±0.001mm | 200 plates/hr automated | 8-16 wks | 99.5% uptime | ISO 12647 |
| Printing Factory | ΔE ≤ 1.5 | 15,000 sph web press | 16-32 wks | 99% uptime | ISO 12647-2 |
| Digital Publishing | 99.9% uptime | 100k docs/day XML pipeline | 6-14 wks | 99.9% uptime | PDF/A, EPUB3 |
| Academic & Institutional | PDF/A-2 | 5,000 theses/yr archive | 10-20 wks | 99.5% uptime | ISO 19005 |
| IC Fabrication | ISO Class 1 | 18.2 MOhm-cm UPW | 24-52 wks | 99.99% uptime | SEMI S2, F57 |
| PCB Factory | 50/50μm trace | 2-64 layers, LDI+plating | 16-36 wks | 99% uptime | IPC-A-600, ISO 9001 |
| Industrial Wastewater | COD ≤ 50mg/L | 500 m³/day treatment | 16-36 wks | 98% uptime | ISO 14001 |
On-site assessment of existing infrastructure, utility capacity, and production requirements.
CAD layout, equipment specification, utility engineering, and 3D clash detection.
Equipment from any manufacturer, unified under MCLANTIS quality protocol and inspection.
Mechanical, electrical, and controls installation by in-house engineering teams.
Performance testing, calibration, FAT/SAT protocols, and operator training.
Documentation package, maintenance contracts, and 24/7 remote monitoring.
Reach out with your facility requirements, production targets, and timeline. Our engineering team will respond with a preliminary scope within 3 business days.