Complete wastewater treatment systems for printing, electronics, and manufacturing facilities — chemical precipitation, membrane filtration, sludge dewatering, and water reuse circuits engineered to meet local discharge standards.
pH adjustment, coagulation (alum/PAC), flocculation (polymer), and sedimentation for heavy metal and suspended solids removal.
Ultrafiltration (UF) and reverse osmosis (RO) for dissolved solids removal, with membrane cleaning automation and flux monitoring.
MBR (membrane bioreactor), MBBR, or activated sludge processes for COD/BOD reduction with nutrient removal (nitrogen/phosphorus).
Belt filter press, centrifugal dewatering, or filter press for sludge reduction to 20-30% dry solids, with sludge drying and disposal planning.
Tertiary treatment with activated carbon, UV disinfection, and RO polishing for process water reuse, reducing freshwater intake by up to 60%.
Real-time monitoring of flow, pH, COD, turbidity, chemical dosing, and pump status with automated alarm and reporting.
| Specification | Value | Notes |
|---|---|---|
| Treatment Capacity | Up to 500 m3/day | Modular, scalable |
| COD Removal | ≥ 95% | Chemical + biological |
| Heavy Metal Removal | ≥ 99% | Precipitation + filtration |
| Effluent COD | ≤ 50 mg/L | Discharge compliant |
| Water Reuse Ratio | Up to 60% | RO + UV polishing |
| Sludge Dry Solids | 20-30% | Belt press / centrifuge |
| Build Timeline | 16-36 weeks | From survey to handover |
| Certification | ISO 14001 | Environmental management |
On-site sampling, flow measurement, and characterization of existing infrastructure and discharge requirements.
Treatment train selection, equipment sizing, 3D layout, and hydraulic modeling with redundancy analysis.
Mechanical, electrical, and controls installation by in-house teams with FAT/SAT protocols.
Performance validation, optimization, operator training, and complete documentation package.
Reach out with your facility requirements, production targets, and timeline. Our engineering team will respond with a preliminary scope within 3 business days.
Contact Engineering Team