From inner-layer imaging to high-density drilling, electroplating, solder mask, and final finish — we engineer PCB manufacturing facilities that deliver consistent yield and registration accuracy.
Dry film lamination, UV exposure (LDI/DWR), development, and etching lines for inner-layer pattern transfer with registration accuracy down to ±0.025mm.
Mechanical and laser drill arrays, spindle cooling, chip extraction, drill bit management, and automated panel loading for via and through-hole formation.
Copper electroplating (vertical continuous / panel), tin plating, DES lines, rectifier systems, and anode management with uniform thickness distribution.
Solder mask coating (LPI spray/curtain), UV exposure, HASL, ENIG, OSP, and immersion tin/silver finish lines with controlled atmosphere curing.
CNC routing and V-scoring, flying probe and fixture-based electrical test, AOI inspection, and automated panel sorting with yield tracking.
Acid/alkaline etching, desmear, electroless copper, micro-etch, and bulk chemical distribution with leak detection and secondary containment.
| Specification | Value | Notes |
|---|---|---|
| Min Trace Width / Spacing | 50/50 μm (2/2 mil) | LDI + controlled etching |
| Layer Count | 2-64 layers | Rigid, flex, rigid-flex, HDI |
| Drill Accuracy | ±0.05mm | Mechanical + laser (UV/CO2) |
| Plating Uniformity | ±10% across panel | Cu vertical continuous plating |
| Surface Finish | HASL / ENIG / OSP / Imm Ag | Multiple finish lines |
| Panel Size | Up to 610×560mm | Standard 18×21" / 20×24" |
| Build Timeline | 16-36 weeks | From design to qualification |
| Standards | IPC-A-600, IPC-6012, ISO 9001 | PCB industry standards |
On-site assessment of current yield, bottleneck identification, layer mix analysis, and utility capacity review for the target production volume.
Process flow optimization, equipment selection, 3D factory layout, chemical/exhaust routing, and automation integration planning.
Mechanical installation, chemical/gas hook-up, electrical and controls integration, MES connectivity, and factory acceptance testing (FAT).
Process qualification, first-article validation, yield optimization, operator training, and complete documentation with maintenance protocols.
Reach out with your facility requirements, production targets, and timeline. Our engineering team will respond with a preliminary scope within 3 business days.